Blog

Office Building Design Starting with An Old Villa, Bucharest

Architecture & Engineering Office Building Design Bucharest, Romania

The Architectural, Structural Engineering, HVAC and Mechanical Projects of this Building were made by our architects and engineers.

The constructor for this building was Cella Invest, under the coordination of Mr. Engineer Catalin Anghelovici.

Site manager: Mrs. Engineer Marina Castaian. The construction works lasted for about 5 months.

The project modified the existing house which was not suitable for the office activity.

After the demolition of the existing attic, the new floor was designed on an iron structure.

We coordinated the bid for the construction works of this building trough our website of post design services. We uploaded all essential information about the project: architectural, structural, mechanical, electrical and HVAC blueprints, specifications, lists of building materials. After that, we received and answered to all technical issues that construction companies had. The final negotiations were made by our client.

 

This Post Has 0 Comments

Leave A Reply

You must be logged in to post a comment.